Menu Engineering Matrix: Stars, Plowhorses, Puzzles and Dogs

The menu engineering matrix sorts the dishes in one menu section using two lines. One is popularity: a dish is popular if its share of the section's sales is at least 70% of an equal share. The other is contribution margin: a dish is profitable if the dollars it leaves after ingredients are at or above the section's sales-weighted average. The two lines make four boxes, stars, plowhorses, puzzles and dogs, and each box comes with one action.
[[wrap:outcome]]
- The two formulas that draw the matrix
- A worked brunch menu, eight dishes, every number shown
- What to do with each of the four boxes
- The five ways the matrix misleads, and a spreadsheet layout
[[/wrap]]
The Two Lines That Make the Matrix
The matrix comes from Michael Kasavana and Donald Smith's menu engineering model, built around 1982 at Michigan State University.[1] If you are new to the idea, start with the guide to what menu engineering is and how to use it. This article is the calculation.
[[wrap:formula]]
Popularity line = (1 ÷ number of dishes in the section) × 70%
A dish is popular when its share of the section's units sold is at or above the line. With 8 dishes, an equal share is 12.5% and the line is 8.75%.
Average contribution margin = total contribution margin ÷ total dishes sold
Contribution margin is the ex-GST price minus the ingredient cost per serve. A dish is profitable when its margin is at or above this average.
[[/wrap]]
Both rules are Kasavana's own wording of the method: "1 / N (70%)" for menu mix and "Menu CM / Number of items sold" for contribution margin.[2] A culinary management textbook uses the same two rules.[3] Run the matrix one section at a time, because a dessert will never compete with a steak on dollars.[2][3]
Worked Example: Eight Brunch Dishes
One month of a fictional cafe's brunch section. Prices are shown ex-GST; the menu price is 1.1 times higher. The figures are invented to show the arithmetic.
| Dish | Sold | Share of sales | Price ex-GST | Cost per serve | Food cost | Contribution margin | Total contribution | Box |
|---|---|---|---|---|---|---|---|---|
| Smashed avo | 620 | 23.8% | A$22.00 | A$4.90 | 22% | A$17.10 | A$10,602.00 | Plowhorse |
| Big breakfast | 540 | 20.8% | A$28.00 | A$9.80 | 35% | A$18.20 | A$9,828.00 | Star |
| Eggs benedict | 410 | 15.8% | A$25.00 | A$6.75 | 27% | A$18.25 | A$7,482.50 | Star |
| Ricotta hotcakes | 380 | 14.6% | A$24.00 | A$5.04 | 21% | A$18.96 | A$7,204.80 | Star |
| Brekkie burger | 300 | 11.5% | A$21.00 | A$6.30 | 30% | A$14.70 | A$4,410.00 | Plowhorse |
| Chilli scrambled eggs | 150 | 5.8% | A$23.00 | A$4.60 | 20% | A$18.40 | A$2,760.00 | Puzzle |
| Acai bowl | 120 | 4.6% | A$20.00 | A$6.40 | 32% | A$13.60 | A$1,632.00 | Dog |
| Mushroom toast | 80 | 3.1% | A$22.00 | A$5.50 | 25% | A$16.50 | A$1,320.00 | Dog |
| Total | 2,600 | 100% | A$45,239.30 |
[[wrap:numbers]]
8.75%|Popularity line|1 ÷ 8 × 70%, about 228 of 2,600 dishes
A$17.40|Average margin|A$45,239.30 ÷ 2,600 dishes sold
3 stars|Out of 8|Big breakfast, eggs benedict, ricotta hotcakes
[[/wrap]]


Read the matrix, not the food cost column. The big breakfast runs at 35% food cost, the highest on the list, and it is a Star: it sells and it leaves A$18.20 a plate. The chilli scrambled eggs run at 20%, the lowest, and it is a Puzzle: a good earner that few people order. The best seller, the smashed avo, is a Plowhorse because its A$17.10 sits just under the A$17.40 average. Lift its margin by 50 cents and, at 620 a month, the section earns A$310 more.
The Four Boxes and What Each One Asks You to Do
The textbook names have a Paul Ayyash equivalent on his workshop slides, and each box comes with an action.[2]
[[wrap:steps]]
Star (Paul: rockstar): keep and highlight
Popular and profitable. Do not change the recipe or portion. Give it the best spot on the menu; Paul puts rockstars in the top right, which his slide calls "the prime visual zone". Kasavana's action is to retain it.[2]
Plowhorse (Paul: workhorse): rework the recipe or the price
Popular but below the average margin. Check the portion against the recipe card, the cost of the sides and the supplier price before you touch the menu. If price is the lever, move it in small steps; raising menu prices without losing customers covers how. Kasavana's action is to reprice.[2]
Puzzle (Paul: hidden gem): promote
Profitable but under-ordered. Move it, rename it, describe it better, box it, or have staff recommend it. Paul's own hidden gem, a roasted cauliflower dish, went into his set menu so guests tasted it. Kasavana's action is to reposition it on the menu.[2]
Dog (Paul: sinker): fix fast or cut
Neither popular nor profitable. Paul's rule is to "fix fast or cut entirely". Keep a dog only if it has a job you can name, such as the one vegetarian option on the menu, and cost it honestly.
[[/wrap]]
[[wrap:main]]
The matrix ranks dollars per plate and plates sold, not food cost percentage. A dish with a high food cost can be a star and a dish with a low one can be a dog. Decide on one change per box, as Paul teaches, so next month's report shows which change worked.
[[/wrap]]
Five Ways the Matrix Misleads
1. Using a simple average for the margin line. Kasavana's rule divides total contribution by total dishes sold, so popular dishes count for more.[2] A plain average of the eight margins in the example is A$16.96, not A$17.40. On that wrong line the smashed avo (A$17.10) becomes a Star, and you would leave your best seller's margin alone.
[[wrap:mistake]]
Averaging the dish margins instead of dividing total contribution by total sold. The weighted line is the method; the simple average moves dishes between boxes.
[[/wrap]]
2. Mixing sections. Mains, brunch, desserts and drinks have different price levels. Put them in one matrix and the desserts all look like dogs.[3]
3. Stale costs. The matrix is only as good as the cost per serve. Paul calls it the "verified cost per serve": current invoice prices and the portion the kitchen actually plates. If your recipe cards are old, re-cost each dish from its recipe before you sort anything.
4. A strange month. A long weekend, a function, a dish that ran out for a week or a new special all bend the sales mix. Use a normal month, and note anything unusual next to the table.
5. Leaving out what the matrix can't see. Labour: a dish that takes ten minutes on the pass costs more than its ingredients show; the textbook notes that low-labour items can justify a lower margin.[3] Add-ons and modifiers: an extra egg or a side of bacon carries its own margin and belongs in its own small analysis. Shared ingredients: cutting a dog that uses the same mushrooms as a star changes less stock than cutting one with its own ingredient list.
Build It in a Spreadsheet
You need one row per dish and ten columns. In Excel or Google Sheets, with dishes in rows 2 to 9:
[[wrap:steps]]
Enter the data
A: dish. B: units sold (POS product mix, one month). C: price ex-GST (menu price ÷ 1.1 if the sale is taxable). D: cost per serve.
Calculate margin and share
E: contribution margin =C2-D2. F: total contribution =B2*E2. G: share of sales =B2/SUM($B$2:$B$9).
Draw the two lines
H: popularity =IF(G2>=(1/COUNTA($A$2:$A$9))*0.7,"High","Low"). I: margin =IF(E2>=SUM($F$2:$F$9)/SUM($B$2:$B$9),"High","Low").
Name the box
J: =IF(AND(H2="High",I2="High"),"Star",IF(H2="High","Plowhorse",IF(I2="High","Puzzle","Dog"))). Plot B against E as a scatter chart and add the two lines if you want the picture.
[[/wrap]]
Paul's own version is shorter: pull last month's sales report, mark your top 10 dishes (his slide says top 20), add the verified cost per serve, sort them into the four groups, and "decide on one change per category". Start there if a full spreadsheet is too much this week, then add the rest of each section.
[[wrap:check]]
- One section per matrix, one normal month of sales
- Prices ex-GST, costs from current invoices and measured portions
- Margin line = total contribution ÷ total dishes sold (weighted)
- Popularity line = 1 ÷ number of dishes × 70%
- One change per box, written down with the date
- Same report four weeks later to see what moved
- Next full review in three to four months
[[/wrap]]
[[wrap:note]]
A management aid, not financial advice. The worked figures are invented to show the arithmetic and are not industry benchmarks. The matrix uses ingredient cost only; read it alongside labour and waste.
[[/wrap]]
[[wrap:closing]]
See Which Leak to Fix First
The matrix shows which dishes earn their place. The free two-minute venue scan looks at food, labour, menu and waste together and tells you where to start.
[[/wrap]]
[[wrap:faq]]
What is a plowhorse in menu engineering?
A plowhorse is a dish that sells well but leaves less than the section's average contribution margin, so it is popular but not pulling its weight in dollars. Kasavana's action is to reprice it. Paul calls it a workhorse and says to rework the recipe or the pricing.
Plowhorses are often a venue's best-known dishes: the burger, the schnitzel, the smashed avo. That is why they are risky to touch and costly to ignore. Because they sell in volume, a small change in margin moves a lot of money. In the worked example, the smashed avo sells 620 a month at A$17.10 margin, against an average of A$17.40. Fifty cents more per plate is A$310 a month.
Work through the cost side first. Weigh the portion against the recipe card; plowhorses often drift because the kitchen makes them all day. Check the sides and garnishes: a dearer side can be swapped for one guests value just as much. Check the supplier price on the main ingredient and whether another supplier or pack size would do. The menu engineering guide linked above tells how Paul did this with the steaks in his own steakhouse.
If price is the lever, move it in small steps rather than one jump, and watch the units sold for a month afterwards. A plowhorse whose sales fall after a price rise may be telling you its price was part of why it sold.
Some plowhorses earn their place in other ways, for example a dish that is quick to make or that brings in customers who order a drink and dessert. Note that reason next to the dish so the decision is deliberate.
What is a puzzle in menu engineering?
A puzzle is a dish that leaves an above-average contribution margin but sells below the popularity line, so it earns well when it sells but too few people order it. Kasavana's action is to reposition it on the menu. Paul calls it a hidden gem and says to promote it aggressively.
The question a puzzle asks is why guests skip it. The usual reasons are visibility, description and price. On a long menu it may simply be hard to find. Its name may not tell the guest what they are getting. Its price may look high next to the dishes around it.
Fix the cheapest reason first. Move it to a spot the eye lands on; Paul's layout slide uses boxes, icons and chef recommendations to draw attention to high-margin items, while warning against boxing everything. Rewrite the description so the guest can picture the plate. Ask the floor team to recommend it, and tell them why.
In the worked example, the chilli scrambled eggs sell 150 a month at A$18.40 margin, above the A$17.40 average but well under the 228-dish line. If promotion lifted it to 250 a month at the same margin, the section would earn an extra 100 × A$18.40 = A$1,840 a month, partly offset by whatever those guests would otherwise have ordered.
Be careful not to turn a puzzle into a plowhorse by cutting its price to sell it. The textbook suggests adding value or a slight price cut, with the warning not to turn the dish into a popular but unprofitable one. Change one thing at a time and check the next month's numbers.
What is the menu engineering formula?
Menu engineering uses two formulas. Popularity line: 1 ÷ the number of dishes in the section × 70%; a dish is popular if its share of sales is at or above it. Margin line: total contribution margin ÷ total dishes sold; a dish is profitable if its margin is at or above it.
Each dish needs three inputs: units sold in the period, ex-GST selling price and ingredient cost per serve. From those you calculate its contribution margin (price minus cost) and its total contribution (margin times units sold).
The popularity rule compares each dish's share of the section's sales with 70% of an equal share. With eight dishes an equal share is 12.5%, so the line is 8.75%; with five dishes it is 14%; with ten it is 7%. The 70% allows a dish to sell somewhat below an equal share and still count as popular.
The margin rule uses a sales-weighted average: add up total contribution for the section and divide by total dishes sold. This matters. A simple average of the dish margins treats a dish sold 80 times the same as one sold 620 times, and it can move dishes between boxes, as the worked example shows.
The two results place each dish in a box: high popularity and high margin is a star; high popularity and low margin is a plowhorse; low popularity and high margin is a puzzle; low on both is a dog.
The formulas are from Kasavana and Smith's model and are set out by Kasavana in his AHLEI series and in culinary management textbooks. Paul uses the same four groups under his own names and adds food cost percentage alongside gross profit per dish when he analyses a menu.
Can you build a menu engineering matrix in Excel?
Yes. A menu engineering matrix needs one row per dish and about ten columns: units sold, ex-GST price, cost per serve, margin, total contribution, share of sales, two IF formulas for the lines, and one for the box. A scatter chart of units sold against margin draws the matrix itself.
The layout in this article works in Excel and Google Sheets. With dishes in rows 2 to 9, the popularity test is =IF(G2>=(1/COUNTA($A$2:$A$9))*0.7,"High","Low") and the margin test is =IF(E2>=SUM($F$2:$F$9)/SUM($B$2:$B$9),"High","Low"), where G is share of sales, E is margin per dish and F is total contribution. A nested IF then names the box.
Keep one tab per menu section and one file per month, so you can compare like with like after a change. Put the date and the source of the sales report at the top of each tab.
Get the inputs right before you trust the chart. Units sold come from the POS product mix report for the same dates. Prices should be ex-GST: divide the menu price by 1.1 for taxable sales. The cost per serve must reflect current invoice prices and the portion actually served. A spreadsheet will happily calculate a neat matrix from last year's costs.
For the chart, use a scatter plot with units sold on one axis and margin on the other, then add the two lines. Label each point with the dish name. The picture helps when you brief a chef or a menu designer; the decisions come from the table.
[[/wrap]]
[[wrap:related]]
What menu engineering is and how to use it
How often to review menu prices, and what to check between reviews
[[/wrap]]
[[wrap:sources]]
- AHLEI, Michael L. Kasavana, "The Power of Menu Engineering, Part One" (8 Apr 2025)
- AHLEI, Michael L. Kasavana, "The Power of Menu Engineering, Part Two" (14 May 2025)
- BC Cook Articulation Committee, Basic Kitchen and Food Service Management, ch. 15 "The Principles of Menu Engineering" (CC BY 4.0)
[[/wrap]]

LAUNCHING YOUR
FOOD SERVICE VENUE?
Explore our hospitality consulting and commercial kitchen design services, or get in touch to talk through your venue.
Book a consultation
