How Much Does It Cost to Open a Restaurant in Australia?

Published cost ranges for opening a restaurant in Australia, what sits in the build figure and how to size your cash reserve, with a worked example.
Brass door key on a folded white tablecloth beside an upturned wine glass, on a dark olive backdrop

Published Australian estimates put the cost of opening a restaurant anywhere from about A$80,000 to more than A$1 million. Square's 2026 guide gives A$150,000 to A$300,000 for quick service, A$250,000 to A$600,000 for fast casual and A$400,000 to A$1 million or more for full service.1 Those are vendor ranges, not quotes for your site. The number that matters is two numbers: what it costs to build, and the cash you need to run the place until trade settles.

[[wrap:outcome]]

  • The published ranges, with who published them and when
  • Every line that belongs in the build figure, including the ones outside the builder's quote
  • A way to size the cash reserve from your own forecast
  • A worked example that shows how a A$450,000 quote becomes a A$603,000 cash need
  • A checklist to run before you sign a lease

[[/wrap]]

Two Numbers, Not One

Paul's first answer to "what does it cost?" is that he cannot give one figure, because every site is different. A former pizzeria with a working kitchen and wash area is a different job from an empty shop with no exhaust and no grease trap. What he does give owners is a way to split the money. In his words: "Build out is one figure and then the cash flow to operate the place is another."

The trap Paul sees is a budget that only holds the first figure. If you are still deciding whether the concept itself works, start with how to open a restaurant with less risk, then come back to the numbers below.

[[wrap:numbers]]

A$80k–A$1m+|Published total range|Square AU, September 2026 (vendor)

A$2,500–A$3,500|Fit-out per m², mid-tier restaurant|HospitalityHub, May 2025 (vendor)

6 months+|Running costs to be able to cover|business.gov.au start-up guidance

[[/wrap]]

The table shows how far the published ranges spread. Use it to sense-check a quote, not to set a budget.

FormatPublished rangeSource and date
Quick-service restaurantA$150,000–A$300,000Square AU, Sep 2026
Fast-casual restaurantA$250,000–A$600,000Square AU, Sep 2026
Full-service restaurantA$400,000–A$1,000,000+Square AU, Sep 2026
Fit-out, basic café or takeawayA$1,800–A$2,500 per m²HospitalityHub, May 2025
Fit-out, mid-tier restaurantA$2,500–A$3,500 per m²HospitalityHub, May 2025
Fit-out, premium or fine diningA$4,000–A$5,500+ per m²HospitalityHub, May 2025

Square says its figures were pulled from public sources in March 2026.1 HospitalityHub's mid-tier band covers dining areas, a bar and a fully equipped commercial kitchen.2 Both businesses sell to hospitality operators. We found no Australian government source that publishes a national cost-to-open figure for restaurants.

What Sits Inside the Build Figure

The builder's quote is the line everyone looks at, and it is rarely the whole build. Paul splits the build into the work that makes the property fit for food, the fit-out itself, and everything that sits around it.

Base-build and property upgrades. Paul calls the landlord's base-build works "category one" costs: the building has to have enough infrastructure to run a restaurant. Ventilation, fire rating, odour control and a grease trap can land outside the fit-out quote as a separate cost to upgrade the property. Before you sign, ask whether category one costs are capped in the lease. If they are not capped, you pay whatever the works cost.

Fit-out. Walls, floors, joinery, plumbing, electrical, mechanical exhaust and finishes. This is the per-square-metre figure in the table above.

Kitchen equipment. HospitalityHub lists commercial kitchen appliances at A$80,000 to A$250,000 for a restaurant, with exhaust hoods and ducting alone at A$10,000 to A$30,000 or more and cool rooms at A$10,000 to A$25,000.2 Square puts a full commercial kitchen set-up at A$60,000 to A$80,000.1 The gap between those two ranges is the reason to price your own equipment list against your own menu.

Design and approvals. Designer, private certifier, engineer, town planner and any reports the council asks for. Paul prices these before the lease is signed, because they become part of the lease negotiation.

Front of house. Furniture, lighting, signage, smallwares, POS hardware.

[[wrap:mistake]]

Treating the builder's quote as the cost to open. A quote for the fit-out does not include equipment, approvals, the base-build upgrades the site needs, the lease money or a single week of wages.

[[/wrap]]

The Lease and Pre-Opening Money

These are the costs between signing and the first paying customer.

  • Security deposit or bank guarantee. Square puts it at 3 to 6 months' rent.1 Paul's point is that a bank guarantee is money tied up: you cannot spend it on the business.
  • Lease legal review. Square gives A$1,000 to A$5,000 for lease negotiation and legal fees.1
  • Rent during the build. Paul's view is that a six-to-eight-week fit-out period is normal practice to ask for. Rent-free time, rent abatement or a landlord contribution are all on the table once you can show the landlord what the site will cost you. If the deal does not stack up, he tells owners to walk.
  • Pre-opening wages, opening stock and launch marketing. Training shifts, a stock fill, menu testing and the first round of marketing all happen before revenue.
  • Licences and registrations. Food business registration is with your council or state food authority, and fees are set locally. Check your council's current schedule on ABLIS before you budget.3

A landlord contribution is not free money. Paul's point is that the landlord gets it back through the rent over the lease, so compare the total rent you will pay, not just the cash you receive up front.

The Running Money: How Big the Reserve Should Be

business.gov.au suggests being able to cover 6 months or more of running costs when you start a business.4 Business Queensland notes that a common reason new businesses fail is not having enough money for expenses, "especially in the first 6–12 months", and suggests a 10% safety buffer on top of your costs.5

Paul's experience points the same way. He tells new owners to expect "a burn period of three to six months": cash going into marketing, extra staff while the team learns, and supply costs before the menu settles. And it takes, in his words, "about six months to work out what the actual operation is".

Our working method sits between those two ideas. Forecast each of the first six months: expected sales minus running costs, including your own wage. Add up the months that come out negative. That total is the smallest reserve that keeps you open if the forecast is right. Then run the same forecast with slower sales. The difference between the two is the cost of being wrong about trade. To see where sales need to land each week, work out your weekly break-even sales first.

A Worked Example: A$450,000 Quote, A$603,000 Cash Need

This example is fictional. The numbers are round on purpose and are not from any real venue. It is a 120 m² casual restaurant going into a former retail shop.

LineAmountHow it was set
Builder: fit-out, kitchen services, exhaust, grease trapA$300,000Example quote
Kitchen equipmentA$80,000Example quote
Design, certifier, engineer, approvalsA$30,000Example quote
Furniture, smallwares, POS, signageA$40,000Example quote
Build quotesA$450,000
Contingency at 10%A$45,00010% of A$450,000
Security deposit: 3 months at A$10,000 rentA$30,0003 × A$10,000
Lease legal reviewA$3,000Example
Pre-opening wages, opening stock, launch marketingA$25,000Example
Running reserve: forecast shortfall in months 1–4A$50,000A$20,000 + A$15,000 + A$10,000 + A$5,000
Total cash neededA$603,000

The build quotes are A$450,000. The cash needed is A$603,000. A plan built on the quotes alone is A$153,000 short, about a quarter of the real figure (A$153,000 ÷ A$603,000 = 25.4%).

Now run the slow case. If every one of the first six months comes in A$10,000 worse than forecast, the shortfall becomes A$30,000 + A$25,000 + A$20,000 + A$15,000 + A$10,000 + A$10,000 = A$110,000. The total cash need rises to A$663,000. That extra A$60,000 is what a slow start costs, and it is the part most first budgets leave out.

[[wrap:check]]

  • Fit-out quote, with what it excludes written down
  • Base-build works: who pays, and are category one costs capped?
  • Kitchen equipment priced from your menu, not from a package
  • Design, certifier, engineer and council fees
  • Security deposit or bank guarantee
  • Lease legal review
  • Rent during the fit-out, and any rent-free period agreed in writing
  • Pre-opening wages, opening stock and launch marketing
  • Contingency on the build
  • A month-by-month forecast for the first six months, including your own wage
  • A slow-sales version of the same forecast

[[/wrap]]

Ways Owners Bring the Number Down, and the Catch With Each

Take over a site that was already a food business. Paul has seen former food sites fitted out for much less than a full build because the wash area and kitchen could be reused. The catch: check that the exhaust, grease trap and services suit your menu before you assume they can stay.

Buy second-hand equipment. It lowers the build figure. Paul's rule when owners go second-hand: put money away for repairs, "generally 5 to 10% of the amount".

Rent or finance equipment. It moves cost from the build figure into weekly payments. Of rent-to-own equipment finance, Paul says "You can use it, but it's very expensive." Put the weekly payment into your running-cost forecast before you decide.

Negotiate with the landlord before signing. Rent-free time, a fit-out period and a contribution can cut the cash you need at the start. Read how the landlord gets that money back.

If the reserve is the line that breaks your budget, the full list of costs that first business plans tend to miss is the next thing to check. Opening a café rather than a restaurant changes the equipment and the fit-out, so the cost of opening a café is covered separately.

[[wrap:magnet]]

Which leak is costing you most?

  • Food cost, labour, menu mix or waste
  • A short set of questions about how your venue runs
  • A score and the leak to fix first

A diagnostic quiz for venue owners, built on Paul's method.

Take the Quiz

[[/wrap]]

[[wrap:note]]

This article is general information, not financial, legal or tax advice. The worked example is fictional and only shows the arithmetic. Get written quotes for your site, have a solicitor review the lease and speak with your accountant about funding and tax.

[[/wrap]]

[[wrap:sources]]

<ol> <li id="r1">Square AU, Essential Guide: Restaurant Startup Costs in Australia (30 September 2026)</li> <li id="r2">HospitalityHub, Restaurant Fitout Prices and Buying Guide Australia (updated 30 May 2025)</li> <li id="r3">ABLIS, Food Business Notification, New South Wales (example of a state process)</li> <li id="r4">business.gov.au, Calculate the start-up costs of your business</li> <li id="r5">Business Queensland, Costs to start and run your business (updated 24 September 2026)</li> </ol>

[[/wrap]]

[[wrap:related]]

How much does it cost to open a café in Australia?

Expenses owners forget in a first restaurant business plan

Restaurant break-even point: formula, worked example and calculator

How do you open a restaurant with less risk?

[[/wrap]]

[[wrap:faq]]

What are the most common start-up costs for a restaurant?

The common start-up costs are the fit-out, kitchen equipment, design and approvals, furniture and POS, the security deposit or bank guarantee, legal fees on the lease, pre-opening wages, opening stock, licences, insurance and launch marketing. On top of those sits the cash reserve to run the venue while sales build.

Business Queensland's list of start-up costs for any business includes market research, financial advice, licences and registrations, the leasing bond and lease advice, insurance, power connection, marketing, equipment and fittings, staffing and opening stock.5 A restaurant adds a few large lines to that list.

Start with the fit-out. HospitalityHub's 2025 guide puts a mid-tier restaurant fit-out at A$2,500 to A$3,500 per square metre.2 Kitchen equipment comes next, and its cost depends on the menu: a menu built around a combi oven and a char grill needs different gear from one built around woks.

Then come the costs that sit outside both quotes. Paul's list starts with the base-build works the site needs before it can be a restaurant at all, such as exhaust and a grease trap, and the design, certifier and engineering fees to get approval. The lease adds a security deposit or bank guarantee, which Square puts at three to six months' rent.1

The line Paul pushes hardest on is the running reserve. He expects a burn period of three to six months, and business.gov.au suggests being able to cover six months or more of running costs.4 Put it in the start-up budget as its own line, so it is not the money that disappears into the build.

How much does it cost to open a small restaurant?

For a small quick-service venue, Square's 2026 guide gives A$150,000 to A$300,000, and A$250,000 to A$600,000 for fast casual. Those are vendor ranges. A small site can still be expensive if it lacks exhaust, a grease trap or the power your kitchen needs.

Small does not always mean cheap per square metre. Some costs are close to fixed whatever the floor area: an exhaust system, a grease trap, approvals and a minimum set of kitchen equipment. Spread over fewer square metres, they push the per-square-metre figure up. HospitalityHub's guide gives a basic café or takeaway fit-out at A$1,800 to A$2,500 per square metre and a mid-tier restaurant at A$2,500 to A$3,500.2

The biggest saving for a small restaurant usually comes from the site, not the size. Paul has seen former food sites fitted out for much less than an empty shell because the kitchen and wash area could be reused. The check is whether what is there suits your menu.

Work out your own figure in this order: price the base-build works the site needs, get fit-out quotes, price equipment from your menu, add design and approvals, add the lease money, then forecast the first six months of trading to size the reserve. A smaller venue usually has a smaller reserve too, because the weekly running costs are lower. The reserve still needs to cover your own wage: Paul insists the owner's pay goes into the forecast.

Does it cost more to open a restaurant in Sydney or Melbourne?

Rent is the clearest difference. Square's 2026 guide puts monthly restaurant rent at A$2,000 to A$8,000 in regional areas and small suburbs, and above A$15,000 in major city centres. We found no government source that publishes a city-by-city cost to open.

Higher rent raises the cost to open in two ways. The security deposit or bank guarantee is usually set as months of rent, so it grows with the rent: Square puts it at three to six months' rent.1 The running reserve grows too, because rent is one of the costs you must cover while sales build.

The build cost moves less predictably. Shopping-centre landlords can set finish standards in their fit-out manual that the tenant pays for, and Paul reads those documents before he prices a job. What a specific site costs depends heavily on its condition. An inner-city tenancy that was already a restaurant can cost less to open than a suburban shell that needs exhaust, a grease trap and a power upgrade.

The honest way to compare two cities, or two suburbs, is to cost both sites the same way: base-build works, fit-out quote, equipment, approvals, lease money, then a six-month trading forecast with each site's rent. Paul's advice is to do this before signing anything, because the costs you find become your case for rent-free time or a landlord contribution.

[[/wrap]]

[[wrap:closing]]

Check the Numbers Before You Sign

Run the checklist above on the site you are looking at, then build the six-month forecast with your own wage in it. If you are close to signing a lease and want a second view on the numbers, Paul can go through them with you.

See What Consulting Covers

[[/wrap]]

Hospo Dojo logo on a leather badge

LAUNCHING YOUR
FOOD SERVICE VENUE?

Explore our hospitality consulting and commercial kitchen design services, or get in touch to talk through your venue.